Attention Birchwood Residents,
The Department of Environment and Local Government at the Birchwood Wastewater Treatment Facility will be replacing the RBC unit from April 25th at 7:00am until April 29th at 7:00pm. During this time, the septic pump truck will need to turn on intermittently to remove sewage. Flows are typically low throughout the nighttime hours; however, it is likely that the truck will need to pump sewage during the night to eliminate the chance of a sewage leak. We apologize in advance for any disturbances, and we greatly appreciate your patience and understanding as this necessary maintenance is in progress.
Thank you. 😊